35244, Birmingham, Alabama - September 25, 2020
Arbor, Pergola or Trellis Construction$3,000.00 to $7,000.00 for 10'x12' pergola (redwood or cedar) $2,000.00 to $4,000.00 for 10'x12' pergola (pressure-treated pine) The style, shape, and size will be calculated into price
Reported by: AJ Murray, BHAM Deck Builders See the Birmingham Gazebos Cost Report
|
|
|
|
|
|
37043, Clarksville, Tennessee - July 25, 2018
Arbor, Pergola or Trellis Construction$2,213.40 to $2,483.10 for 10'x12' pergola (pressure-treated pine) Cost includes pergola installation. Includes all building materials (lumber, hardware, etc.) to build 10' x 12' freestanding wood pergola (9 ft high; open roof). Items excluded: complex footings, painting, trellis walls, arched pergolas, closed roofs, electrical wiring, climbing plants, exotic woods, or masonry work.
Reported by: ProMatcher Research Team See the Clarksville Gazebos Cost Report
|
|
|
|
|
|
56560, Moorhead, Minnesota - July 25, 2018
Arbor, Pergola or Trellis Construction$2,206.26 to $2,475.09 for 10'x12' pergola (pressure-treated pine) Cost estimate takes into account the price of pergola construction. Price includes lumber (pressure-treated pine) and mounting hardware for a standalone shade structure with an open roof. Excludes wood staining, pouring a concrete slab, patio or deck construction, awnings, privacy panels, deep footings, electrical work, larger pergolas, or additional landscaping projects.
Reported by: ProMatcher Research Team See the Moorhead Gazebos Cost Report
|
|
|
|
|
|
68106, Omaha, Nebraska - July 25, 2018
Arbor, Pergola or Trellis Construction$2,101.54 to $2,357.61 for 10'x12' pergola (pressure-treated pine) Price takes into account the cost of pergola construction. No additional charge for lumber (pressure-treated pine) and mounting hardware for a standalone shade structure with an open roof. Excludes wood staining, pouring a concrete slab, patio or deck construction, awnings, privacy panels, deep footings, electrical work, larger pergolas, or additional landscaping projects.
Reported by: ProMatcher Research Team See the Omaha Gazebos Cost Report
|
|
|
|
|
|
|